Second order conic approximation for disassembly line design with joint probabilistic constraints
DOI10.1016/j.ejor.2015.06.019zbMath1346.90298OpenAlexW650349603MaRDI QIDQ320132
Olga Battaïa, S. Jack Hu, Mohand Lounes Bentaha, Alexandre Dolgui
Publication date: 6 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://hal-emse.ccsd.cnrs.fr/emse-01184866/file/Bentaha_20097.pdf
stochastic programmingpiecewise linear approximationassembly and disassemblyjoint probabilistic constraintsline design and balancing
Applications of mathematical programming (90C90) Stochastic programming (90C15) Production models (90B30)
Related Items (8)
Cites Work
- Unnamed Item
- Unnamed Item
- A sample average approximation method for disassembly line balancing problem under uncertainty
- A decomposition based solution algorithm for U-type assembly line balancing with interval data
- Convex piecewise-linear fitting
- Optimizing financial and physical assets with chance-constrained programming in the electrical industry
- Uniform quasi-concavity in probabilistic constrained stochastic programming
- A chance-constrained approach to stochastic line balancing problem
- A cost minimization procedure for mixed model production lines with normally distributed task times
- Applications of second-order cone programming
- Bonferroni inequalities
- A joint chance-constrained programming model with row dependence
- Second-order cone programming
- A second-order cone programming approach for linear programs with joint probabilistic constraints
- A dual-uncertainty-based chance-constrained model for municipal solid waste management
- Extensions of the dynamic programming method in the deterministic and stochastic assembly-line balancing problems
- On safe tractable approximations of chance constraints
- Stability measure for a generalized assembly line balancing problem
- Optimally solving the alternative subgraphs assembly line balancing problem
- Balancing stochastic two-sided assembly lines: a chance-constrained, piecewise-linear, mixed integer program and a simulated annealing algorithm
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- A linear programming approach for linear programs with probabilistic constraints
- A heuristic algorithm for a chance constrained stochastic program
- The stochastic U-line balancing problem: a heuristic procedure
- Genetic algorithm based technique for solving chance constrained problems
- A survey on problems and methods in generalized assembly line balancing
- An optimal piecewise-linear program for the U-line balancing problem with stochastic task times
- Stability analysis of an optimal balance for an assembly line with fixed cycle time
- A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem
- Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths
- ASALBP: the alternative subgraphs assembly line balancing problem
- The ASALB Problem with Processing Alternatives Involving Different Tasks: Definition, Formalization and Resolution
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- A Preference Order Dynamic Program for Stochastic Assembly Line Balancing
- Chance-Constrained Programming with Joint Constraints
- The stochastic U-line balancing problem
- Disassembly line in product recovery
- A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem
- Profit-oriented disassembly-line balancing
- Convex Approximations of Chance Constrained Programs
- Modeling and analysis of a mixed‐model assembly line with stochastic operation times
- Stochastic assembly line balancing using beam search
This page was built for publication: Second order conic approximation for disassembly line design with joint probabilistic constraints