Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption
From MaRDI portal
Publication:320777
DOI10.1016/j.ejor.2015.08.064zbMath1346.90370OpenAlexW1416338368MaRDI QIDQ320777
Umut Besikci, Emel Aktas, S. Afshin Mansouri
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.08.064
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items (20)
Approximate dynamic programming for an energy-efficient parallel machine scheduling problem ⋮ Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under time-of-use tariff ⋮ Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness ⋮ Editorial: Sustainable scheduling of manufacturing and transportation systems ⋮ A hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rate ⋮ Minimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling Problem ⋮ Energy aware scheduling in flexible flow shops with hybrid particle swarm optimization ⋮ Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem ⋮ Multi-objective energy-efficient hybrid flow shop scheduling using Q-learning and GVNS driven NSGA-II ⋮ Bi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup times ⋮ Energy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraints ⋮ The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions ⋮ A multi-objective approach for manufacturing systems with multiple production routes based on supervisory control theory and heuristic algorithms ⋮ Production planning under RTP, TOU and PPA considering a redox flow battery storage system ⋮ A bi-criteria optimization model for medical device sterilization ⋮ Schedule-allocate and robust sequencing in three-machine robotic cell under breakdowns ⋮ Opportunities and challenges in sustainable supply chain: an operations research perspective ⋮ A bi-objective heuristic approach for green identical parallel machine scheduling ⋮ Hybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturing ⋮ Multi-objective reentrant hybrid flowshop scheduling with machines turning on and off control strategy using improved multi-verse optimizer algorithm
Uses Software
Cites Work
- Two-machine flowshop scheduling with flexible operations and controllable processing times
- A branch-and-bound algorithm for minimizing the energy consumption in the PFS problem
- Hybrid flowshop scheduling with machine and resource-dependent processing times
- Evolving better population distribution and exploration in evolutionary multi-objective optimization
- Sensitivity of Pareto solutions in multiobjective optimization
- Some efficient heuristic methods for the flow shop sequencing problem
- The two-machine sequence dependent flowshop scheduling problem
- Set-up coordination between two stages of a supply chain
- Solving the flowshop scheduling problem with sequence dependent setup times using advanced metaheuristics
- Scheduling batches in flowshop with limited buffers in the shampoo industry
- The bi-objective pollution-routing problem
- The two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategies
- A survey of scheduling problems with setup times or costs
- An iterated greedy heuristic for the sequence dependent setup times flowshop problem with makespan and weighted tardiness objectives
- Multicriteria scheduling problems: a survey
- Optimal two- and three-stage production schedules with setup times included
- FLOWSHOP SCHEDULES WITH SEQUENCE DEPENDENT SETUP TIMES
- Coordination of set-ups between two stages of a supply chain using multi-objective genetic algorithms
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Multiobjective Optimization
- Optimal Production Planning with Emissions Trading
- Operational methods for minimization of energy consumption of manufacturing equipment
- Scheduling
This page was built for publication: Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption