Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption

From MaRDI portal
Publication:320777

DOI10.1016/j.ejor.2015.08.064zbMath1346.90370OpenAlexW1416338368MaRDI QIDQ320777

Umut Besikci, Emel Aktas, S. Afshin Mansouri

Publication date: 7 October 2016

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2015.08.064




Related Items (20)

Approximate dynamic programming for an energy-efficient parallel machine scheduling problemExact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under time-of-use tariffMatheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardinessEditorial: Sustainable scheduling of manufacturing and transportation systemsA hybrid manufacturing system with demand for intermediate goods and controllable make-to-stock production rateMinimizing Total Idle Energy Consumption in the Permutation Flow Shop Scheduling ProblemEnergy aware scheduling in flexible flow shops with hybrid particle swarm optimizationMinimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problemMulti-objective energy-efficient hybrid flow shop scheduling using Q-learning and GVNS driven NSGA-IIBi‐criteria formulation for green scheduling with unrelated parallel machines with sequence‐dependent setup timesEnergy-aware production scheduling in the flow shop environment under sequence-dependent setup times, group scheduling and renewable energy constraintsThe synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directionsA multi-objective approach for manufacturing systems with multiple production routes based on supervisory control theory and heuristic algorithmsProduction planning under RTP, TOU and PPA considering a redox flow battery storage systemA bi-criteria optimization model for medical device sterilizationSchedule-allocate and robust sequencing in three-machine robotic cell under breakdownsOpportunities and challenges in sustainable supply chain: an operations research perspectiveA bi-objective heuristic approach for green identical parallel machine schedulingHybrid flow shop with unrelated machines, setup time, and work in progress buffers for bi-objective optimization of tortilla manufacturingMulti-objective reentrant hybrid flowshop scheduling with machines turning on and off control strategy using improved multi-verse optimizer algorithm


Uses Software



Cites Work




This page was built for publication: Green scheduling of a two-machine flowshop: trade-off between makespan and energy consumption