Finding robust timetables for project presentations of student teams
From MaRDI portal
Publication:320999
DOI10.1016/j.ejor.2015.08.047zbMath1346.90321OpenAlexW2099206192MaRDI QIDQ320999
M. Erdem Külünk, Cenk Koçaş, Can Akkan
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.08.047
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)
Related Items
A bi-criteria hybrid genetic algorithm with robustness objective for the course timetabling problem, Search algorithms for improving the Pareto front in a timetabling problem with a solution network-based robustness measure, The proactive and reactive resource-constrained project scheduling problem, The balanced maximally diverse grouping problem with block constraints
Uses Software
Cites Work
- Unnamed Item
- A survey of search methodologies and automated system development for examination timetabling
- The shift team formation problem in multi-shift manufacturing operations
- Executing production schedules in the face of uncertainties: a review and some future directions
- Personnel scheduling: a literature review
- Recent advances in robust optimization: an overview
- A survey of dynamic scheduling in manufacturing systems
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- A survey of metaheuristic-based techniques for university timetabling problems
- An Evolutionary Algorithm for Polishing Mixed Integer Programming Solutions
- The Concept of Recoverable Robustness, Linear Programming Recovery, and Railway Applications
- A Bicriteria Approach for Robust Timetabling
- The Structure and Function of Complex Networks
- Assigning pupils to tutor groups in a comprehensive school
- Increasing Service Levels in Conference and Educational Scheduling: A Heuristic Approach