THE LEXICO-BOUNDED FLOW ALGORITHM FOR SOLVING THE MINIMUM COST PROJECT SCHEDULING PROBLEM WITH AN ADDITIONAL LINEAR CONSTRAINT
From MaRDI portal
Publication:3220333
DOI10.15807/JORSJ.27.230zbMATH Open0555.90055OpenAlexW2729109596MaRDI QIDQ3220333
Publication date: 1984
Published in: Journal of the Operations Research Society of Japan (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.15807/jorsj.27.230
additional linear constraintlexico-shortest route algorithmminimum cost project scheduling problemparametrized right-hand side