Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP
DOI10.1016/j.ejor.2015.10.059zbMath1346.90398OpenAlexW1832328668MaRDI QIDQ322615
Xi-Xi Hong, Zhou Wu, Jian-Chao Tang, Jing Xiao, Yong Tang
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2015.10.059
heuristicsevolutionary algorithmsmultiple objective programmingresource-constrained project schedulingelectromagnetism
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (4)
Uses Software
Cites Work
- Unnamed Item
- Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems
- Bi-objective resource-constrained project scheduling with robustness and makespan criteria
- A random key based genetic algorithm for the resource constrained project scheduling problem
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- An iterative scheduling technique for resource-constrained project scheduling
- A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
- Interactive analysis of multiple-criteria project scheduling problems
- Nonlinear multiobjective optimization
- DSS for multiobjective project scheduling
- Resource-constrained project scheduling: Notation, classification, models, and methods
- An electromagnetism-like mechanism for global optimization
- Knowledge-based intelligent information and engineering systems. 7th international conference, KES 2003, Oxford, UK, September 3--5, 2003. Proceedings, Part I.
- Using metaheuristics in multiobjective resource constrained project scheduling
- Multi-objective metaheuristic algorithms for the resource-constrained project scheduling problem with precedence relations
- A hybrid scatter search/electromagnetism meta-heuristic for project scheduling
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
This page was built for publication: Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP