Column generation based approaches for a tour scheduling problem with a multi-skill heterogeneous workforce
DOI10.1016/j.ejor.2016.01.036zbMath1346.90472OpenAlexW2320679437MaRDI QIDQ323020
Ruslan Sadykov, François Clautiaux, Matthieu Gérard
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.01.036
Applications of mathematical programming (90C90) Integer programming (90C10) Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Theory of organizations, manpower planning in operations research (90B70)
Related Items (4)
Uses Software
Cites Work
- Unnamed Item
- On an exact method for the constrained shortest path problem
- A branch-and-price algorithm for the multi-activity multi-task shift scheduling problem
- An integer linear programming-based heuristic for scheduling heterogeneous, part-time service employees
- Scheduling workforce relief breaks in advance versus in real-time
- Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem
- A large neighbourhood search approach to the multi-activity shift scheduling problem
- Staff scheduling and rostering: a review of applications, methods and models.
- Multi-skilled workforce optimisation
- Personnel scheduling: a literature review
- Stabilized branch and price with dynamic parameter updating for discontinuous tour scheduling
- Branch-and-price for staff rostering: an efficient implementation using generic programming and nested column generation
- Efficient shift scheduling in the retail sector through two-stage optimization
- Column Generation based Primal Heuristics
- Decomposition Principle for Linear Programs
- A Primer in Column Generation
This page was built for publication: Column generation based approaches for a tour scheduling problem with a multi-skill heterogeneous workforce