Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty
DOI10.1016/j.ejor.2016.03.007zbMath1346.90363OpenAlexW2295949192MaRDI QIDQ323260
Roussos Dimitrakopoulos, Amina Lamghari
Publication date: 7 October 2016
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2016.03.007
Lagrangian relaxationmetaheuristicsopen-pit mine production schedulingprogressive hedging methodsliding time window heuristic
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
Cites Work
- Unnamed Item
- Scenario grouping in a progressive hedging-based meta-heuristic for stochastic network design
- Production scheduling with uncertain supply: a new solution to the open pit mining problem
- A sliding time window heuristic for open pit mine block sequencing
- Direct sequential co-simulation with joint probability distributions
- Block simulation of multiple correlated variables
- Progressive hedging and tabu search applied to mixed integer (0,1) multistage stochastic programming
- An application of branch and cut to open pit mine scheduling
- A diversified tabu search approach for the open-pit mine production scheduling problem with metal uncertainty
- A strengthened formulation and cutting planes for the open pit mine production scheduling problem
- Robust Planning for an Open-Pit Mining Problem under Ore-Grade Uncertainty
- Introduction to Stochastic Programming
- Progressive hedging-based metaheuristics for stochastic network design
- Geostatistics
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
- Solving LP Relaxations of Large-Scale Precedence Constrained Problems
- Progressive hedging as a meta-heuristic applied to stochastic lot-sizing
This page was built for publication: Progressive hedging applied as a metaheuristic to schedule production in open-pit mines accounting for reserve uncertainty