Two-Echelon Supply Chain Model in an Imperfect Production with Stochastic Demand Considering the Rework of the Defective Items
From MaRDI portal
Publication:3297302
DOI10.1007/978-3-030-34152-7_33zbMath1436.90013OpenAlexW3005339405MaRDI QIDQ3297302
Sujata Saha, Tripti Chakrabarti
Publication date: 3 July 2020
Published in: Recent Advances in Intelligent Information Systems and Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/978-3-030-34152-7_33
Cites Work
- An inventory model for imperfect items under inflationary conditions with considering inspection errors
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- An economic production lot size model in an imperfect production system
- Effects of random defective rate and imperfect rework process on economic production quantity model
- The optimal replenishment policy for time-varying stochastic demand under vendor managed inventory
- An economic production lot size model for defective items with stochastic demand, backlogging and rework
This page was built for publication: Two-Echelon Supply Chain Model in an Imperfect Production with Stochastic Demand Considering the Rework of the Defective Items