Approximating Weighted Completion Time for Order Scheduling with Setup Times
From MaRDI portal
Publication:3297757
DOI10.1007/978-3-030-38919-2_8zbMath1440.90011arXiv1910.08360OpenAlexW3004260557MaRDI QIDQ3297757
Simon Pukrop, Alexander Mäcker, Friedhelm Meyer auf der Heide
Publication date: 20 July 2020
Published in: SOFSEM 2020: Theory and Practice of Computer Science (Search for Journal in Brave)
Full work available at URL: https://arxiv.org/abs/1910.08360
Cites Work
- Unnamed Item
- Unnamed Item
- The third comprehensive survey on scheduling problems with setup times/costs
- Strong LP formulations for scheduling splittable jobs on unrelated machines
- On the approximability of average completion time scheduling under precedence constraints.
- Splitting versus setup trade-offs for scheduling to minimize weighted completion time
- Strong NP-hardness of the single machine multi-operation jobs total completion time scheduling problem.
- Scheduling multi-operation jobs on a single machine
- Precedence constrained scheduling to minimize sum of weighted completion times on a single machine
- A survey of scheduling problems with setup times or costs
- Approximation algorithms for problems in scheduling with set-ups
- Complexity of Scheduling under Precedence Constraints
- Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
- On the Complexity of Scheduling with Batch Setup Times
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms
- Optimal Long Code Test with One Free Bit
This page was built for publication: Approximating Weighted Completion Time for Order Scheduling with Setup Times