Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
From MaRDI portal
Publication:3313600
DOI10.1287/opre.32.1.89zbMath0531.90049OpenAlexW2137370418MaRDI QIDQ3313600
Publication date: 1984
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.32.1.89
Related Items
Mixed integer programming formulations for the biomass truck scheduling problem, A metaheuristic solution approach for the time-constrained project scheduling problem, An exact algorithm for an integrated project staffing problem with a homogeneous workforce, Resource-constrained multi-project scheduling with tardy costs: Comparing myopic, bottleneck, and resource pricing heuristics, A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints, Time-constrained project scheduling, Multi-mode resource constrained multi-project scheduling and resource portfolio problem, Multi-mode resource availability cost problem with recruitment and release dates for resources, Advanced DSS for scheduling: Software engineering aspects and the role of eigenmodels, Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project, Complexity of the project scheduling problem with credits, A genetic algorithm for resource investment problem with discounted cash flows, A resource type analysis of the integrated project scheduling and personnel staffing problem, Evolutionary algorithms for multi-objective stochastic resource availability cost problem, A capacity-oriented hierarchical approach to single-item and small-batch production planning using project-scheduling methods, A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, Robust optimization models for project scheduling with resource availability cost, Stochastic scheduling problems I — General strategies, Mixed-integer linear programming for resource leveling problems, Project scheduling with finite or infinite number of activity processing modes -- a survey, Scheduling of project networks, A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations, The multi-mode resource investment problem: a benchmark library and a computational study of lower and upper bounds, Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms, Multimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedure, Negotiation mechanisms for the multi-agent multi-mode resource investment problem, The bilevel optimisation of a multi-agent project scheduling and staffing problem, Multi-parallel work centers scheduling optimization with shared or dedicated resources in low-volume low-variety production systems, An effective heuristic for project scheduling with resource availability cost, Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems, Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm, Fuzzy project scheduling problem and its hybrid intelligent algorithm, An exact algorithm for minimizing resource availability costs in project scheduling, Time-constrained project scheduling with adjacent resources, Single-machine scheduling with an external resource, An efficient genetic algorithm to maximize net present value of project payments under inflation and bonus-penalty policy in resource investment problem, Um algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modos, Resource-constrained project scheduling: Notation, classification, models, and methods, Resource levelling for projects with schedule-dependent time windows, Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations, A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations, A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties, A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems, Heuristics for multimode scheduling problems with dedicated resources, Scatter search for project scheduling with resource availability cost, Project scheduling problem with stochastic activity duration times, Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints, Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization