A Method for Determining Feasible Master Production Schedules for Material Requirements Planning Systems
From MaRDI portal
Publication:3318515
DOI10.1080/02522667.1984.10698781zbMath0534.90042OpenAlexW1982993890MaRDI QIDQ3318515
Publication date: 1984
Published in: Journal of Information and Optimization Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/02522667.1984.10698781
Cites Work
This page was built for publication: A Method for Determining Feasible Master Production Schedules for Material Requirements Planning Systems