A Combined Block and Repair Limit Replacement Policy
From MaRDI portal
Publication:3323678
DOI10.2307/2582787zbMath0537.90046OpenAlexW4232874699MaRDI QIDQ3323678
D. N. Prabhakar Murthy, D. G. Nguyen
Publication date: 1984
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.2307/2582787
Related Items (9)
A number-dependent replacement policy for a system with continuous preventive maintenance and random lead times ⋮ Optimal replacement model with age-dependent failure type based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy ⋮ Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks ⋮ A note on a two variable block replacement policy for a system subject to non-homogeneous pure birth shocks ⋮ The role of repair strategy in warranty cost minimization: An investigation via quasi-renewal processes ⋮ A generalized age and block replacement of a system subject to shocks ⋮ Equipment reliability and maintenance ⋮ Extended block replacement policy with shock models and used items
This page was built for publication: A Combined Block and Repair Limit Replacement Policy