Effect of learning and forgetting on economic lot size scheduling problem
From MaRDI portal
Publication:3323682
DOI10.1080/00207548308942410zbMath0537.90049OpenAlexW2083063459MaRDI QIDQ3323682
Publication date: 1983
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207548308942410
Related Items (3)
The effects of workforce heterogeneity on productivity in an experiential learning environment ⋮ Some single-machine scheduling problems with elapsed-time-based and position-based learning and forgetting effects ⋮ The lot size problem and the learning curve: a review of mathematical modeling (1950's--2020)
Cites Work
- On the Feasibility of Scheduling Lot Sizes for Two Products on One Machine
- A Simple Method of Determining Order Quantities in Joint Replenishments Under Deterministic Demand
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
This page was built for publication: Effect of learning and forgetting on economic lot size scheduling problem