An integrated layout for group technology with in-process inventory costs
From MaRDI portal
Publication:3329198
DOI10.1080/00207548408942464zbMath0541.90049OpenAlexW2047212858MaRDI QIDQ3329198
Avraham Shtub, Amiya K. Chakravarty
Publication date: 1984
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207548408942464
Related Items (8)
A graph partitioning procedure for machine assignment and cell formation in group technology† ⋮ Optimal lot-sizing in multi-item production inventories ⋮ Optimization of a multi-stage production-inventory system with significant set-up operation time ⋮ Group technology inventories with optimal production costs ⋮ Machine layout problem in modern manufacturing facilities ⋮ The capacitated cell formation problem: a new hierarchical methodology ⋮ A multi-objective procedure for labour assignments and grouping in capacitated cell formation problems ⋮ A comparison of scheduling philosophies for manufacturing cells
Cites Work
- Note—On the Optimality of Integer Lot Size Ratios in “Economic Lot Size Determination in Multi-Stage Assembly Systems”
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- Assembly-Line Balancing—Dynamic Programming with Precedence Constraints
- Economic Lot Size Determination in Multi-Stage Assembly Systems
This page was built for publication: An integrated layout for group technology with in-process inventory costs