On a make-to-stock production/mountain model with hysteretic control
From MaRDI portal
Publication:333073
DOI10.1007/s10479-014-1658-7zbMath1348.90020OpenAlexW2039035513MaRDI QIDQ333073
Andreas Löpker, David Perry, Onno J. Boxma
Publication date: 9 November 2016
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10479-014-1658-7
Related Items (1)
Cites Work
- Unnamed Item
- A make-to-stock mountain-type inventory model
- Queues with workload-dependent arrival and service rates
- The G/M/1 queue revisited
- Continuous feedback fluid queues
- Fluid queues with level dependent evolution
- Martingale methods for analysing single-server queues
- The M/G-G/1 oscillating queueing system
- Queues with Lévy input and hysteretic control
- First exit times for compound Poisson dams with a general release rule
- A workload-dependent \(M/G/1\) queue under a two-stage service policy
- M/M/1 Queues with Switching Costs and Hysteretic Optimal Control
- Approximations for the single-product production-inventory problem with compound Poisson demand and service-level constraints
- On the Cycle Maximum of Mountains, Dams and Queues
- Storage processes with general release rule and additive inputs
- The Stationary Distribution and First Exit Probabilities of a Storage Process with General Release Rule
- A Production-Inventory Control Model with a Mixture of Back-Orders and Lost-Sales
- Optimal control of finite dams: discrete (2-stage) output procedure
- FLUID QUEUES AND MOUNTAIN PROCESSES
- ON/OFF STORAGE SYSTEMS WITH STATE-DEPENDENT INPUT, OUTPUT, AND SWITCHING RATES
- On generalized hysteretic control queues with modulated input and state dependent service
- Level crossing methods in stochastic models
- Optimal control of a finite dam: average-cost case
This page was built for publication: On a make-to-stock production/mountain model with hysteretic control