Inequalities and Bounds in Stochastic Shop Scheduling
From MaRDI portal
Publication:3337205
DOI10.1137/0144062zbMath0545.90057OpenAlexW1976484931MaRDI QIDQ3337205
Richard R. Weber, Michael L. Pinedo
Publication date: 1984
Published in: SIAM Journal on Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1137/0144062
Related Items (2)
Four decades of research on the open-shop scheduling problem to minimize the makespan ⋮ Determining the optimal sequences and the distributional properties of their completion times in stochastic flow shops
This page was built for publication: Inequalities and Bounds in Stochastic Shop Scheduling