Scheduling precedence graphs of bounded height
From MaRDI portal
Publication:3339283
DOI10.1016/0196-6774(84)90039-7zbMath0547.68037OpenAlexW2005751233MaRDI QIDQ3339283
Danny Dolev, Manfred K. Warmuth
Publication date: 1984
Published in: Journal of Algorithms (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0196-6774(84)90039-7
schedulingNP-completenesspolynomial algorithmprecedence graphidentical processorspartially ordered set of unit length tasks
Related Items
Profile Scheduling of Opposing Forests and Level Orders ⋮ A survey on how the structure of precedence constraints may change the complexity class of scheduling problems ⋮ Applications of scheduling theory to formal language theory ⋮ A fixed-parameter algorithm for scheduling unit dependent tasks on parallel machines with time windows ⋮ Optimal scheduling of unit-time tasks on two uniform processors under tree-like precedence constraints ⋮ Unnamed Item ⋮ Scheduling unit-length jobs with precedence constraints of small height ⋮ A branch-and-bound algorithm to solve the equal-execution-time job scheduling problem with precedence constraint and profile ⋮ Optimal assignment of task modules with precedence for distributed processing by graph matching and state-space search ⋮ Polyhedral Reformulation of a Scheduling Problem And Related Theoretical Results ⋮ Preemptive scheduling and antichain polyhedra ⋮ Preemptive scheduling with variable profile, precedence constraints and due dates ⋮ Optimality of HLF for scheduling divide-and-conquer UET task graphs on identical parallel processors ⋮ Three notes on scheduling unit-length jobs with precedence constraints to minimize the total completion time ⋮ Optimal scheduling on parallel machines for a new order class