Log Bucking and Lumber Manufacturing Using Dynamic Programming
From MaRDI portal
Publication:3347601
DOI10.1287/mnsc.30.2.245zbMath0558.90039OpenAlexW2129543545MaRDI QIDQ3347601
David A. Briggs, Bruce Faaland
Publication date: 1984
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.30.2.245
Applications of mathematical programming (90C90) Production models (90B30) Dynamic programming (90C39)
Related Items (5)
The log bucking problem: A comparison of dynamic programming versus branch and bound ⋮ Application of optimization for solving a sawing stock problem with a cant sawing pattern ⋮ Supply network planning in the forest supply chain with bucking decisions anticipation ⋮ Lumber production optimization ⋮ Integrated defect detection and optimization for cross cutting of wooden boards
This page was built for publication: Log Bucking and Lumber Manufacturing Using Dynamic Programming