Manufacturing systems with forbidden early order departure
From MaRDI portal
Publication:3347603
DOI10.1080/00207548408942428zbMath0558.90040OpenAlexW1976589319MaRDI QIDQ3347603
David P. Christy, John J. Kanet
Publication date: 1984
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207548408942428
Deterministic scheduling theory in operations research (90B35) Queues and service in operations research (90B22) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (7)
Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach ⋮ Scheduling for stability in single-machine production systems ⋮ Scheduling rule selection for the forbidden early shipment environment: a comparison of economic objectives ⋮ An approach to production planning and scheduling in cyclically scheduled manufacturing systems ⋮ Sequencing and due-date determination in the stochastic single machine problem with earliness and tardiness costs ⋮ A model of incentive contracts for just-in-time delivery ⋮ Information and scheduling in a dual resource constrained job shop
Cites Work
This page was built for publication: Manufacturing systems with forbidden early order departure