Scheduling of a Two-machine Flowshop with Travel Time Between Machines
From MaRDI portal
Publication:3351128
DOI10.1057/jors.1991.121zbMath0727.90037OpenAlexW2119910905MaRDI QIDQ3351128
Publication date: 1991
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1991.121
Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (13)
Machine scheduling with job delivery coordination ⋮ Scheduling a two-machine robotic cell: A solvable case ⋮ Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ Flowshop scheduling with interstage job transportation ⋮ A two-stage flow shop scheduling problem with transportation considerations ⋮ New complexity results on scheduling problem in a robotic cell ⋮ Machine scheduling with transportation considerations ⋮ Machine scheduling with deliveries to multiple customer locations ⋮ Makespan minimization for flow-shop problems with transportation times and a single robot ⋮ Optimization of processing and delivery decisions involving third-party machines ⋮ Optimal robot scheduling to minimize the makespan in a three-machine flow-shop environment with job-independent processing times ⋮ The evolution of schematic representations of flow shop scheduling problems ⋮ Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time
This page was built for publication: Scheduling of a Two-machine Flowshop with Travel Time Between Machines