Job Release: Part of a Hierarchical System to Manage Manufacturing Lead Times in Make-to-order Companies
From MaRDI portal
Publication:3354774
DOI10.1057/jors.1991.167zbMath0729.90766OpenAlexW1975037361MaRDI QIDQ3354774
L. C. Hendry, Brian G. Kingsman
Publication date: 1991
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1991.167
Related Items (3)
Heuristic procedures for a stochastic lot-sizing problem in make-to-order manufacturing ⋮ Production planning with load dependent lead times: An update of research ⋮ Production strategies for a stochastic lot-sizing problem with constant capacity
This page was built for publication: Job Release: Part of a Hierarchical System to Manage Manufacturing Lead Times in Make-to-order Companies