Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Scheduling of Project Networks by Job Assignment - MaRDI portal

Scheduling of Project Networks by Job Assignment

From MaRDI portal
Publication:3356081

DOI10.1287/mnsc.37.12.1590zbMath0729.91011OpenAlexW2157119487MaRDI QIDQ3356081

Andreas Drexl

Publication date: 1991

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/10419/161993




Related Items (43)

On a paper by Christofides et al. for solving the multiple-resource constrained, single project scheduling problemAn exact algorithm for an integrated project staffing problem with a homogeneous workforceThe job shop tardiness problem: A corrected modelScheduling and staffing multiple projects with a multi-skilled workforcePractical solutions for a dock assignment problem with trailer transportationPriority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splittingStrength and adaptability of problem-space based neighborhoods for resource-constrained schedulingAn exact algorithm for project scheduling with multiple modesControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesProduction scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithmA Survey of the Generalized Assignment Problem and Its ApplicationsA constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraintsA \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project schedulingA fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectAn evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lagsA hybrid genetic algorithm for the resource-constrained project scheduling problemRobust surgery loadingMeta-heuristics for stable scheduling on a single machineCase-based reasoning and improved adaptive search for project schedulingMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemA genetic algorithm for the resource constrained multi-project scheduling problemAn effective shuffled frog-leaping algorithm for resource-constrained project scheduling problemNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingA double genetic algorithm for the MRCPSP/maxA neurogenetic approach for the resource-constrained project scheduling problemTheoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problemsJustification and RCPSP: a technique that paysKapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problemResource-constrained project scheduling: Notation, classification, models, and methodsSerial and parallel resource-constrained project scheduling methods revisited: Theory and computationMulti-level, single-machine lot sizing and scheduling (with initial inventory)Scheduling projects with limited number of preemptionsAudit scheduling with overlapping activities and sequence-dependent setup costsProject scheduling under resource and mode identity constraints: Model, complexity, methods, and applicationDistribution requirements and compactness constraints in school timetablingHeuristics for multimode scheduling problems with dedicated resourcesMulti-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithmBidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projectsA classification scheme for integrated staff rostering and scheduling problemsA new tabu search procedure for an audit-scheduling problemCompetitive methods for multi-level lot sizing and scheduling: tabu search and randomized regretsTabu search in audit scheduling




This page was built for publication: Scheduling of Project Networks by Job Assignment