Sufficient Working Subsets for the Tour Scheduling Problem
From MaRDI portal
Publication:3356092
DOI10.1287/mnsc.37.11.1441zbMath0729.91021OpenAlexW1988249480MaRDI QIDQ3356092
Fred F. Easton, Donald F. Rossin
Publication date: 1991
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.37.11.1441
Integer programming (90C10) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Working set generation methods for labor tour scheduling ⋮ A mixed integer programming approach to multi-skilled workforce scheduling ⋮ A dynamic programming algorithm for days-off scheduling with sequence dependent labor costs ⋮ A microcomputer-based heuristic for tour scheduling of a mixed workforce ⋮ A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives ⋮ Balancing staffing and switching costs in a service center with flexible servers ⋮ Scheduling workforce relief breaks in advance versus in real-time ⋮ Cost analysis of alternative formulations for personnel scheduling in continuously operating organizations ⋮ Unnamed Item ⋮ An online approach to dynamic rescheduling for production planning applications ⋮ An integer programming model for the weekly tour scheduling problem ⋮ A distributed genetic algorithm for deterministic and stochastic labor scheduling problems ⋮ A sequential integer programming method for discontinuous labor tour scheduling ⋮ A genetic algorithm for scheduling staff of mixed skills under multi-criteria ⋮ Variable employee productivity in workforce scheduling