Off-Day Scheduling with Hierarchical Worker Categories
From MaRDI portal
Publication:3359983
DOI10.1287/opre.39.3.484zbMath0732.90041OpenAlexW2107998902WikidataQ52451738 ScholiaQ52451738MaRDI QIDQ3359983
Publication date: 1991
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.39.3.484
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08) Theory of organizations, manpower planning in operations research (90B70)
Related Items (9)
An integer programming model for hierarchical workforce scheduling problem ⋮ Single-shift off-day scheduling of a hierarchical workforce with variable demands ⋮ A case study of single shift planning and scheduling under annualized hours: a simple three-step approach. ⋮ Airport ground workforce planning with hierarchical skills: a new formulation and branch-and-price approach ⋮ Shift rostering using decomposition: assign weekend shifts first ⋮ Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times ⋮ A sequential integer programming method for discontinuous labor tour scheduling ⋮ An algorithm for single shift scheduling of hierarchical workforce ⋮ A flexible MILP model for multiple-shift workforce planning under annualized hours
This page was built for publication: Off-Day Scheduling with Hierarchical Worker Categories