Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop

From MaRDI portal
Publication:3360653
Jump to:navigation, search

DOI10.1057/jors.1991.31zbMath0733.90034OpenAlexW2119754524MaRDI QIDQ3360653

Cheng, T. C. Edwin

Publication date: 1991

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1991.83


zbMATH Keywords

single machinepolynomial-time algorithmbicriteria objective functionknown processing times and due dates


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)


Related Items

Multiple and bicriteria scheduling: A literature survey




This page was built for publication: Optimal Assignment of Total-work-content Due-dates and Sequencing in a Single-machine Shop

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:3360653&oldid=16620357"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 4 February 2024, at 16:13.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki