Layer modelling for the inspection allocation problem in re-entrant production systems
From MaRDI portal
Publication:3369514
DOI10.1080/13629390500124515zbMath1082.90520OpenAlexW2171482357MaRDI QIDQ3369514
No author found.
Publication date: 2 February 2006
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/13629390500124515
inspection allocation problemlayered fabricationre-entrant production systemworkstation of variables data
Related Items (3)
Workflow analysis of production lines with complete inspection and rework loops ⋮ Inspection location in capacity-constrained lines ⋮ A particle swarm algorithm for inspection optimization in serial multi-stage processes
Cites Work
- Optimal inspection policies in a serial production system including scrap rework and repair: An MILP approach
- Imperfect Inspection in a Multistage Production Process
- Planning quality inspection operations in multistage manufacturing systems with inspection errors
- Inspection for Circuit Board Assembly
- Inspection resource assignment in a multistage manufacturing system with an inspection error model
- Shortest Route Models for the Allocation of Inspection Effort on a Production Line
- The Analysis of a Simple Class of Multistage Inspection Plans
This page was built for publication: Layer modelling for the inspection allocation problem in re-entrant production systems