Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance

From MaRDI portal
Publication:337029

DOI10.1016/j.cor.2014.02.004zbMath1348.90243OpenAlexW2018438060MaRDI QIDQ337029

Hamid Allaoui, Saïd Hanafi, Abdelhakim Artiba, Rachid Benmansour

Publication date: 10 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2014.02.004




Related Items (5)



Cites Work


This page was built for publication: Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance