The concrete delivery problem
From MaRDI portal
Publication:337044
DOI10.1016/j.cor.2014.02.008zbMath1348.90104OpenAlexW2081520677MaRDI QIDQ337044
Tony Wauters, Joris Kinable, Greet vanden Berghe
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.02.008
Mixed integer programming (90C11) Transportation, logistics and supply chain management (90B06) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
Mixed integer programming formulations for the biomass truck scheduling problem ⋮ Exact algorithms for single-machine scheduling with time windows and precedence constraints ⋮ Survey of quantitative methods in construction
Cites Work
- Unnamed Item
- Genetic algorithms for supply-chain scheduling: a case study in the distribution of ready-mixed concrete
- Analysis, modeling and solution of the concrete delivery problem
- Hybridization of very large neighborhood search for ready-mixed concrete delivery problems
- Integer linear programming models for a cement delivery problem
- A branch-and-price algorithm for parallel machine scheduling with time windows and job priorities
- Column Generation
This page was built for publication: The concrete delivery problem