Scheduling multiple factory cranes on a common track
From MaRDI portal
Publication:337056
DOI10.1016/j.cor.2014.03.005zbMath1348.90299OpenAlexW2072406267MaRDI QIDQ337056
Iiro Harjunkoski, Samid Hoda, Ben Peterson, John N. Hooker
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.03.005
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (5)
Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows ⋮ Cooperative twin-crane scheduling ⋮ Sequencing dual-spreader crane operations: mathematical formulation and heuristic algorithm ⋮ A generalized classification scheme for crane scheduling with interference ⋮ A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals
Cites Work
- A heuristic for the quay crane scheduling problem based on contiguous bay crane operations
- Crane scheduling in container yards with inter-crane interference
- Sequencing and scheduling in robotic cells: recent developments
- A bounding scheme for deriving the minimal cycle time of a single- transporter \(N\)-stage process with time-window constraints
- Modeling and solving rich quay crane scheduling problems
- An improved hybrid model for the generic hoist scheduling problem
- Single hoist cyclic scheduling with multiple tanks: A material handling solution
- A crane scheduling method for port container terminals
- A solution for cyclic scheduling of multi-hoists without overlapping
- Throughput optimization in robotic cells
- An efficient algorithm for multi-hoist cyclic scheduling with fixed processing times
- A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal
- The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints
- Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions
- Single-track multi-hoist scheduling problem: a collision-free resolution based on a branch-and-bound approach
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
This page was built for publication: Scheduling multiple factory cranes on a common track