Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
From MaRDI portal
Publication:337057
DOI10.1016/j.cor.2014.03.009zbMath1348.90221OpenAlexW2078764258MaRDI QIDQ337057
Albert Corominas, Gema Calleja, Rafael Pastor, Alberto García-Villoria
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.03.009
Mixed integer programming (90C11) Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30)
Related Items (5)
Assembly line balancing: what happened in the last fifteen years? ⋮ Hybrid metaheuristics for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2) ⋮ Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1) ⋮ Solving the accessibility windows assembly line problem level 1 and variant 1 (AWALBP-L1-1) with precedence constraints ⋮ A new MILP model for the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)
Cites Work
- Moving policies in cyclic assembly line scheduling
- \texttt{Absalom}: balancing assembly lines with assignment restrictions
- Assembly line balancing in a mixed-model sequencing environment with synchronous transfers.
- Reduction approaches for a generalized line balancing problem
- Stability measure for a generalized assembly line balancing problem
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem
- A classification of assembly line balancing problems
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- Matheuristics
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Workload Balancing in Multi-stage Production Processes
This page was built for publication: Combining matheuristics and MILP to solve the accessibility windows assembly line balancing problem level 2 (AWALBP-L2)