A fix-and-optimize heuristic for the high school timetabling problem

From MaRDI portal
Publication:337176

DOI10.1016/j.cor.2014.06.023zbMath1348.90251OpenAlexW2017615131MaRDI QIDQ337176

Árton P. Dorneles, Olinto C. B. de Araújo, Luciana S. Buriol

Publication date: 10 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2014.06.023




Related Items (25)

Relax-fix-optimize heuristics for time-relaxed sports timetablingLate acceptance hill-climbing for high school timetablingDeveloping compact course timetables with optimized student flowsMathematical models and algorithms for a high school timetabling problemmaxSAT-based large neighborhood search for high school timetablingMixed integer programming based heuristics for the patient admission scheduling problemModeling high school timetabling with bitvectorsA multi-stage IP-based heuristic for class timetabling and trainer rosteringParallel local search algorithms for high school timetabling problemsA dynamic Thompson sampling hyper-heuristic framework for learning activity planning in personalized learningHigh quality timetables for Italian schoolsA fix‐and‐optimize heuristic for the minmax regret shortest path arborescence problem under interval uncertaintyHome healthcare staff dimensioning problem for temporary caregivers: a matheuristic solution approachMIP heuristics for a resource constrained project scheduling problem with workload stability constraintsFix-and-optimize metaheuristics for minmax regret binary integer programming problems under interval uncertaintyProblem space search metaheuristics with fix and optimize approach for the integrated fleet sizing and replenishment planning problemThe coupled task scheduling problem: an improved mathematical program and a new solution algorithmFix-and-optimize procedures for solving the long-term unit commitment problem with pumped storagesSearch algorithms for improving the Pareto front in a timetabling problem with a solution network-based robustness measureInbound and outbound flow integration for cross-docking operationsA column generation approach to high school timetabling modeled as a multicommodity flow problemTwo heuristics for the capacitated multi-period cutting stock problem with pattern setup costHandling fairness issues in time-relaxed tournaments with availability constraintsModeling interdependencies in infrastructure systems using multi-layered network flowsThe multiphase course timetabling problem


Uses Software


Cites Work


This page was built for publication: A fix-and-optimize heuristic for the high school timetabling problem