Setting defect charts control limits to balance cycle time and yield for a tandem production line
DOI10.1016/J.COR.2014.05.011zbMath1348.62270OpenAlexW2049368522MaRDI QIDQ337306
Liron Yedidsion, Miri Gilenson, Michael Hassoun
Publication date: 10 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2014.05.011
Applications of statistics in engineering and industry; control charts (62P30) Production models (90B30) Applications of Markov chains and discrete-time Markov processes on general state spaces (social mobility, learning theory, industrial processes, etc.) (60J20) Graphical methods in statistics (62A09)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Exact Results for Shewhart Control Charts with Supplementary Runs Rules
- Approximate Analysis of General Queuing Networks by Decomposition
- An approach to the probability distribution of cusum run length
- Some inequalities for the queue GI/G/1
- Finding the convex hull of a simple polygon
This page was built for publication: Setting defect charts control limits to balance cycle time and yield for a tandem production line