Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
scientific article - MaRDI portal

scientific article

From MaRDI portal
Publication:3374086

zbMath1105.90313MaRDI QIDQ3374086

Pinar Keskinocak, Sridhar R. Tayur

Publication date: 9 March 2006


Title: zbMATH Open Web Interface contents unavailable due to conflicting licenses.



Related Items (30)

Pooling heterogeneous products for manufacturing environmentsRevenue management for operations with urgent ordersResource loading with time windowsCapacity and lead-time management when demand for service is seasonal and lead-time sensitiveOn scheduling a multiclass queue with abandonments under general delay costsA hybrid genetic algorithm based on a two-level hypervolume contribution measure selection strategy for bi-objective flexible job shop problemReinforcement learning for joint pricing, lead-time and scheduling decisions in make-to-order systemsOptimal quoting of delivery time by a third party logistics provider: the impact of shipment consolidation and temporal pricing schemesDynamic appointment scheduling with wait-dependent abandonmentCongestion-based leadtime quotation and pricing for revenue maximization with heterogeneous customersImpact of priority sequencing decisions on on-time probability and expected tardiness of orders in make-to-order production systems with external due-datesImproving delivery reliability by a new due-date setting ruleA Benders decomposition approach for order acceptance and scheduling problem: a robust optimization approachCompetitive algorithms for due date schedulingAn Artificial Bee Colony Based Hyper-heuristic for the Single Machine Order Acceptance and Scheduling ProblemIncorporating manufacturing lead times in joint production-marketing models: A review and some future directionsE-fulfillment and multi-channel distribution - A reviewOptimal and heuristic lead-time quotation for an integrated steel mill with a minimum batch sizePrice and Lead Time Quotation for Contract and Spot CustomersBicriteria problems to minimize maximum tardiness and due date assignment cost in various scheduling environmentsExact algorithms for a generalization of the order acceptance and scheduling problem in a single-machine environmentAvailable-to-promise modeling for multi-plant manufacturing characterized by lack of homogeneity in the product: an illustration of a ceramic caseOrder acceptance using genetic algorithmsResearch on optimization of production decision based on payment time and price coordinationInventory Control and Delivery Time Quotation for Assembly Supply ChainsScheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristicsCustomer segmentation, allocation planning and order promising in make-to-stock productionRevenue management and demand fulfillment: Matching applications, models, and softwareEstablishing delivery guarantee policiesPricing and scheduling decisions with leadtime flexibility




This page was built for publication: