THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE
From MaRDI portal
Publication:3392292
DOI10.1142/S0217595909002249zbMath1176.90244OpenAlexW2091790639MaRDI QIDQ3392292
Guo Sun, Jianfeng Ren, Yu-Zhong Zhang
Publication date: 14 August 2009
Published in: Asia-Pacific Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0217595909002249
Related Items (10)
Semi-online scheduling on two identical machines with a common due date to maximize total early work ⋮ A single machine scheduling problem to minimize total early work ⋮ Scheduling with competing agents, total late work and job rejection ⋮ Variable neighborhood search for the single machine scheduling problem to minimize the total early work ⋮ A two-agent single-machine scheduling problem with late work criteria ⋮ Scheduling on parallel identical machines with late work criterion: offline and online cases ⋮ Minimizing total late work on a single machine with generalized due-dates ⋮ A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion ⋮ Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date ⋮ Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works
Cites Work
- Unnamed Item
- Approximation algorithms for scheduling a single machine to minimize total late work
- Scheduling a batching machine
- Approximation algorithms in batch processing
- Scheduling one batch processor subject to job release dates
- On scheduling an unbounded batch machine
- Minimizing total completion time on a batch processing machine with job families
- Single Machine Scheduling to Minimize Total Late Work
- Efficient Algorithms for Scheduling Semiconductor Burn-In Operations
- Minimizing makespan on a single batch processing machine with dynamic job arrivals
- A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work
This page was built for publication: THE NP-HARDNESS OF MINIMIZING THE TOTAL LATE WORK ON AN UNBOUNDED BATCH MACHINE