Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

An iterated sample construction with path relinking method: application to switch allocation in electrical distribution networks

From MaRDI portal
Publication:339534
Jump to:navigation, search

DOI10.1016/J.COR.2012.05.006zbMath1349.90156OpenAlexW2037057090MaRDI QIDQ339534

Marcus Ritt, Paulo Morelato França, Alexander J. Benavides, Luciana S. Buriol

Publication date: 11 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2012.05.006


zbMATH Keywords

metaheuristicspath relinkingpower systems reliabilitysample algorithmsswitch allocation


Mathematics Subject Classification ID

Approximation methods and heuristics in mathematical programming (90C59) Deterministic network models in operations research (90B10)


Related Items (2)

An integrated planning model in centralized power systems ⋮ Switch allocation problem in power distribution systems with distributed generation


Uses Software

  • PERL
  • TTTPLOTS



Cites Work

  • TTT plots: a perl program to create time-to-target plots
  • A Greedy Randomized Adaptive Search Procedure for Maximum Independent Set




This page was built for publication: An iterated sample construction with path relinking method: application to switch allocation in electrical distribution networks

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:339534&oldid=12213120"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 02:37.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki