Solving software project scheduling problems with ant colony optimization
From MaRDI portal
Publication:339536
DOI10.1016/j.cor.2012.05.007zbMath1349.90420OpenAlexW2021765132MaRDI QIDQ339536
Xian-Ting Ao, Jing Xiao, Yong Tang
Publication date: 11 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2012.05.007
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints, Impacts of synergies on software project scheduling, Multi-project scheduling problem under shared multi-skill resource constraints, An updated survey of variants and extensions of the resource-constrained project scheduling problem, Dynamic vehicle routing with time windows in theory and practice, A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Ant colony optimization for continuous domains
- A survey of variants and extensions of the resource-constrained project scheduling problem
- Scheduling subject to resource constraints: Classification and complexity
- Resource-constrained project scheduling: A survey of recent developments.
- Resource-constrained project scheduling: Notation, classification, models, and methods
- A hybrid metaheuristic for the resource-constrained project scheduling problem
- Staffing a software project: A constraint satisfaction and optimization-based approach
- A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
- Genetic algorithms for project management