MAKESPAN MINIMIZATION WITH MACHINE AVAILABILITY CONSTRAINTS
From MaRDI portal
Publication:3397506
DOI10.1142/S1793830909000129zbMath1178.90150OpenAlexW2165861840MaRDI QIDQ3397506
Yumei Huo, Bin Fu, Hairong Zhao
Publication date: 22 September 2009
Published in: Discrete Mathematics, Algorithms and Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s1793830909000129
Analysis of algorithms (68W40) Deterministic scheduling theory in operations research (90B35) Approximation algorithms (68W25)
Related Items (1)
Cites Work
- Unnamed Item
- Parallel machines scheduling with nonsimultaneous machine available time
- Complexity and algorithms for two-stage flexible flowshop scheduling with availability constraints
- Scheduling machine-dependent jobs to minimize lateness on machines with identical speed under availability constraints
- Approximation results for flow shop scheduling problems with machine availability constraints
- Non-preemptive two-machine open shop scheduling with non-availability constraints
- A PTAS for the multiple subset sum problem with different knapsack capacities
- The effect of machine availability on the worst-case performance of LPT
- Makespan minimization for two parallel machines with an availability constraint
- Approximability of scheduling with fixed jobs
- Scheduling with limited machine availability
- Parallel machine scheduling with machine availability and eligibility constraints
- Machine scheduling with an availability constraint
- Two-machine flow shops with limited machine availability
This page was built for publication: MAKESPAN MINIMIZATION WITH MACHINE AVAILABILITY CONSTRAINTS