Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Three-stage hybrid-flowshop model for cross-docking

From MaRDI portal
Publication:340335
Jump to:navigation, search

DOI10.1016/J.COR.2012.11.009zbMath1349.90315OpenAlexW1995083986MaRDI QIDQ340335

Adrien Bellanger, Christophe Wilbaut, Saïd Hanafi

Publication date: 14 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2012.11.009


zbMATH Keywords

branch-and-boundheuristichybrid flowshopbatching machinescross-docking


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items (5)

Mathematical estimation for maximum flow of goods within a cross-dock to reduce inventory ⋮ Probabilistic tabu search for the cross-docking assignment problem ⋮ Inbound and outbound flow integration for cross-docking operations ⋮ Integrated scheduling and assignment of trucks at unit-load cross-dock terminals with mixed service mode dock doors ⋮ Integrating workload smoothing and inventory reduction in three intermodal logistics platforms of a European car manufacturer







This page was built for publication: Three-stage hybrid-flowshop model for cross-docking

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:340335&oldid=12214530"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 02:37.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki