A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times
DOI10.1016/j.cor.2015.04.010zbMath1349.90053OpenAlexW2004753507MaRDI QIDQ342038
Jing Xiao, Huasheng Yang, Jatinder N. D. Gupta, Li Zheng, Canrong Zhang
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2015.04.010
Lagrangian relaxationsimulated annealingunrelated parallel machinescapacitated lot-sizing and schedulingsequence-dependent setup
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Inventory, storage, reservoirs (90B05)
Related Items (16)
Cites Work
- Single and parallel machine capacitated lotsizing and scheduling: new iterative MIP-based neighborhood search heuristics
- Fix-and-optimize heuristics for capacitated lot-sizing with sequence-dependent setups and substitutions
- Polyhedral and Lagrangian approaches for lot sizing with production time windows and setup times
- A heuristic approach for big bucket multi-level production planning problems
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
- Lotsizing and scheduling for production planning
- Simultaneous lotsizing and scheduling on parallel machines
- Single item lot-sizing problems with backlogging on a single machine at a finite production rate
- Capacitated lot-sizing with sequence dependent setup costs
- Simultaneous lotsizing and scheduling by combining local search with dual reoptimization
- An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
- A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines
- Rolling-horizon and fix-and-relax heuristics for the parallel machine lot-sizing and scheduling problem with sequence-dependent set-up costs
- Lot-sizing with production and delivery time windows
- Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales
- A Tabu-Search Heuristic for the Capacitated Lot-Sizing Problem with Set-up Carryover
- Hybrid heuristics for the multi-stage capacitated lot sizing and loading problem
- A New Dantzig-Wolfe Reformulation and Branch-and-Price Algorithm for the Capacitated Lot-Sizing Problem with Setup Times
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Capacitated lot-sizing and scheduling with parallel machines, back-orders, and setup carry-over
- Deterministic Production Planning: Algorithms and Complexity
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- Multiperiod production planning carrying over set-up time
- An effective heuristic for the CLSP with set-up times
- Validation of subgradient optimization
- A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over
- Scheduling
This page was built for publication: A hybrid Lagrangian-simulated annealing-based heuristic for the parallel-machine capacitated lot-sizing and scheduling problem with sequence-dependent setup times