History-dependent scheduling: models and algorithms for scheduling with general precedence and sequence dependence
From MaRDI portal
Publication:342093
DOI10.1016/j.cor.2015.06.007zbMath1349.90336OpenAlexW2418175665MaRDI QIDQ342093
Mohan Krishnamoorthy, Andreas T. Ernst, Narayan Rangaraj, Vishnu Narayanan, Niraj Ramesh Dayama
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2015.06.007
integer programmingcombinatorial optimizationcrane schedulingfixed interval schedulinghistory-dependent schedulingsequence-dependent scheduling
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Single-machine scheduling against due dates with past-sequence-dependent setup times
- The pickup and delivery problem with time windows
- On the complexity of blocks-world planning
- A Generalized Insertion Heuristic for the Traveling Salesman Problem with Time Windows
- An Exact Constraint Logic Programming Algorithm for the Traveling Salesman Problem with Time Windows
- Algorithms for the Vehicle Routing and Scheduling Problems with Time Window Constraints
- Faster Algorithms for Feedback Arc Set Tournament, Kemeny Rank Aggregation and Betweenness Tournament
- Production scheduling with history-dependent setup times
- Integer Programming Formulation of Traveling Salesman Problems
- A Branch-and-Cut Algorithm for the Resolution of Large-Scale Symmetric Traveling Salesman Problems
- State-space relaxation procedures for the computation of bounds to routing problems
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem
- A polyhedral study of the asymmetric traveling salesman problem with time windows
- The General Pickup and Delivery Problem
- An Optimal Algorithm for the Traveling Salesman Problem with Time Windows
- The Vehicle Routing Problem with Time Windows Part II: Genetic Search
- Blocks World revisited
- Solving the asymmetric travelling salesman problem with time windows by branch-and-cut
This page was built for publication: History-dependent scheduling: models and algorithms for scheduling with general precedence and sequence dependence