STOCHASTIC SCHEDULING WITH ASYMMETRIC EARLINESS AND TARDINESS PENALTIES UNDER RANDOM MACHINE BREAKDOWNS
From MaRDI portal
Publication:3422739
DOI10.1017/S0269964806060396zbMath1275.90031OpenAlexW2161708969MaRDI QIDQ3422739
Publication date: 13 February 2007
Published in: Probability in the Engineering and Informational Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1017/s0269964806060396
Related Items (3)
A stochastic approach for the single-machine scheduling problem to minimize total expected cost with client-dependent tardiness costs ⋮ Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties ⋮ Analysis of computer job control under uncertainty
Cites Work
- Single machine flow-time scheduling with a single breakdown
- The stochastic single machine scheduling problem with earliness and tardiness costs
- A single-machine scheduling problem with random processing times
- Asymmetric earliness and tardiness scheduling with exponential processing times on an unreliable machine
- Stochastic single machine scheduling with an exponentially distributed due date
This page was built for publication: STOCHASTIC SCHEDULING WITH ASYMMETRIC EARLINESS AND TARDINESS PENALTIES UNDER RANDOM MACHINE BREAKDOWNS