Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal - MaRDI portal

A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal

From MaRDI portal
Publication:3423263

DOI10.1002/nav.20121zbMath1112.90033OpenAlexW2047449665MaRDI QIDQ3423263

Jean-François Cordeau, Gilbert Laporte, Luigi Moccia, Manlio Gaudioso

Publication date: 20 February 2007

Published in: Naval Research Logistics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1002/nav.20121




Related Items (37)

A Benders decomposition-based framework for solving quay crane scheduling problemsThe quay crane scheduling problem with time windowsA tabu search heuristic for the quay crane scheduling problemSome complexity results and an efficient algorithm for quay crane scheduling problemCompact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problemsHybrid evolutionary computation methods for quay crane scheduling problemsScheduling multiple factory cranes on a common trackOn double cycling for container port productivity improvementA heuristic for the quay crane scheduling problem based on contiguous bay crane operationsA reclaimer scheduling problem arising in coal stockyard managementExact methods for the quay crane scheduling problem when tasks are modeled at the single container levelThe crane scheduling problem: models and solution approachesDetermining crane areas in intermodal transshipment yards: the yard partition problemCombining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vesselSequencing dual-spreader crane operations: mathematical formulation and heuristic algorithmConstraint programming models for integrated container terminal operationsScheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacityA branch-and-cut algorithm for factory crane scheduling problemRobust optimization for the integrated berth allocation and quay crane assignment problemMIP approaches for the integrated berth allocation and quay crane assignment and scheduling problemA generalized classification scheme for crane scheduling with interferenceNew bounds and algorithms for the transshipment yard scheduling problemAn integrated model for the transshipment yard scheduling problemHow to park freight trains on rail-rail transshipment yards: the train location problemAn evolutionary approach to a combined mixed integer programming model of seaside operations as arise in container portsVehicle Routing Problems and Container Terminal Operations – An Update of ResearchApproximate the scheduling of quay cranes with non-crossing constraintsThe role of operational research in green freight transportationOperations research at container terminals: a literature updateAn effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problemModeling and solving rich quay crane scheduling problemsA fast heuristic for quay crane scheduling with interference constraintsContainer sequencing for quay cranes with internal reshufflesAn exact algorithm for the unidirectional quay crane scheduling problem with vessel stabilityA local branching-based algorithm for the quay crane scheduling problem under unidirectional schedulesScheduling for multi-robot routing with blocking and enabling constraintsA survey of berth allocation and quay crane scheduling problems in container terminals


Uses Software


Cites Work


This page was built for publication: A branch-and-cut algorithm for the quay crane scheduling problem in a container terminal