Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times

From MaRDI portal
Publication:342351

DOI10.1016/j.cor.2016.01.017zbMath1349.90310OpenAlexW2262841629MaRDI QIDQ342351

Young-Jin An, Seong-Woo Choi, Yeong-Dae Kim

Publication date: 17 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.cor.2016.01.017




Related Items (5)



Cites Work


This page was built for publication: Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times