Paint batching problem on \(M\)-to-1 conveyor systems
From MaRDI portal
Publication:342469
DOI10.1016/j.cor.2016.04.019zbMath1349.90284OpenAlexW2342711390MaRDI QIDQ342469
Yong-Hee Han, Sung-Seok Ko, Jin Young Choi
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2016.04.019
dynamic programminggenetic algorithm\(M\)-to-1 conveyor systempaint batching problemre-sequencingsetup minimization
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Dynamic programming (90C39)
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- An inexact algorithm for the sequential ordering problem
- A sequential ordering problem in automotive paint shops
- An Ant Colony System Hybridized with a New Local Search for the Sequential Ordering Problem
- Online Optimization of a Color Sorting Assembly Buffer Using Ant Colony Optimization