New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem
From MaRDI portal
Publication:342481
DOI10.1016/J.COR.2016.04.007zbMath1349.90300OpenAlexW2341031254MaRDI QIDQ342481
Hamid Abedinnia, Christoph H. Glock, Andreas Brill
Publication date: 17 November 2016
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2016.04.007
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (7)
A beam-search-based constructive heuristic for the PFSP to minimise total flowtime ⋮ Automatic design of constructive heuristics for a reconfigurable distributed flowshop group scheduling problem ⋮ A simheuristic algorithm for the stochastic permutation flow‐shop problem with delivery dates and cumulative payoffs ⋮ Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times ⋮ Synergy of genetic algorithm with extensive neighborhood search for the permutation flowshop scheduling problem ⋮ Scheduling blocking flowshops with setup times via constraint guided and accelerated local search ⋮ Optimization of stability of humanoid robot NAO using ant colony optimization tuned MPC controller for uneven path
Cites Work
- On insertion tie-breaking rules in heuristics for the permutation flowshop scheduling problem
- A new set of high-performing heuristics to minimise flowtime in permutation flowshops
- A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime
- An improved NEH-based heuristic for the permutation flowshop problem
- An estimation of distribution algorithm for minimizing the total flowtime in permutation flowshop scheduling problems
- An empirical analysis of the optimality rate of flow shop heuristics
- An efficient heuristic for scheduling in a flowshop to minimize total weighted flowtime of jobs
- A heuristic algorithm for mean flowtime objective in flowshop scheduling
- A comprehensive review and evaluation of permutation flowshop heuristics
- Efficient heuristics for flowshop sequencing with the objectives of makespan and flowtime minimisation
- Local search methods for the flowshop scheduling problem with flowtime minimization
- Benchmarks for basic scheduling problems
- Comparison of heuristics for flowtime minimisation in permutation flowshops
- Flowshop scheduling research after five decades
- Performance guarantees for flowshop heuristics to minimize makespan
- The Complexity of Flowshop and Jobshop Scheduling
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objective
- Different initial sequences for the heuristic of Nawaz, Enscore and Ham to minimize makespan, idletime or flowtime in the static permutation flowshop sequencing problem
- Flowshop-scheduling problems with makespan criterion: a review
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- A Functional Heuristic Algorithm for the Flowshop Scheduling Problem
- Scheduling
This page was built for publication: New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem