An adaptive large neighborhood search heuristic for the electric vehicle scheduling problem

From MaRDI portal
Publication:342549

DOI10.1016/j.cor.2016.06.013zbMath1349.90417OpenAlexW2469644863MaRDI QIDQ342549

Mohammad Hasan, M. Dambrine

Publication date: 17 November 2016

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://backend.orbit.dtu.dk/ws/files/125153260/An_adaptive_large_neighborhood_search_heuristic_for_the_Electric_Vehicle_Scheduling_Problem.post_print.pdf




Related Items (19)

A path-based solution approach for the green vehicle routing problemElectric bus planning \& scheduling: a review of related problems and methodologiesA heuristic approach for a real-world electric vehicle routing problemA hybrid algorithm for urban transit schedule optimizationSolution approaches for integrated vehicle and crew scheduling with electric busesFleet and charging infrastructure decisions for fast-charging city electric bus serviceThe traveling purchaser problem with fast service optionA survey of adaptive large neighborhood search algorithms and applicationsScheduling the vehicles of bus rapid transit systems: a case studyMulti-depot electric vehicle scheduling in in-plant production logistics considering non-linear charging modelsAn adaptive large neighbourhood search metaheuristic for hourly learning activity planning in personalised learningA large neighborhood search-based matheuristic for the load-dependent electric vehicle routing problem with time windowsElectric vehicle routing problem with time-dependent waiting times at recharging stationsA matheuristic method for the electric vehicle routing problem with time windows and fast chargersScheduling of Electric Vehicles in the Police FleetPickup and delivery problem with recharging for material handling systems utilising autonomous mobile robotsMeta-analysis of metaheuristics: quantifying the effect of adaptiveness in adaptive large neighborhood searchA matheuristic for AGV scheduling with battery constraintsAn exact approach for the multi-depot electric bus scheduling problem with time windows



Cites Work




This page was built for publication: An adaptive large neighborhood search heuristic for the electric vehicle scheduling problem