Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment
From MaRDI portal
Publication:3430238
DOI10.1080/00207540600597047zbMath1114.90381OpenAlexW2055219501MaRDI QIDQ3430238
No author found.
Publication date: 21 March 2007
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540600597047
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Theory of fuzzy sets, etc. (03E72)
Related Items (2)
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times ⋮ On the latest starting times and criticality of activities in a network with imprecise durations
Cites Work
- A state-of-the-art review of parallel-machine scheduling research
- Scheduling around a small common due date
- Scheduling to minimize weighted earliness and tardiness about a common due-date
- On the general solution for a class of early/tardy problems
- Parallel machine scheduling with earliness--tardiness penalties and additional resource con\-straints.
- A fuzzy project scheduling approach to minimize schedule risk for product development
- Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
- A fuzzy set approach to activity scheduling for product development
- Sequencing with Earliness and Tardiness Penalties: A Review
- Minimizing mean absolute deviation of completion times about a common due date
- Minimizing Mean Squared Deviation of Completion Times About a Common Due Date
- Single-machine scheduling to minimize absolute deviation of completion times from a common due date
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Information Distortion in a Supply Chain: The Bullwhip Effect
- Fuzzy sets
- An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
- Parallel machine scheduling with a common due window
This page was built for publication: Determination of fault-tolerant fabric-cutting schedules in a just-in-time apparel manufacturing environment