Hybrid genetic algorithm for group technology economic lot scheduling problem
From MaRDI portal
Publication:3430241
DOI10.1080/00207540500534405zbMath1114.90384OpenAlexW2039423380MaRDI QIDQ3430241
H. C. Bae, B. C. Cha, I. K. Moon
Publication date: 21 March 2007
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207540500534405
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (2)
A common cycle approach for solving the economic lot and inspection scheduling problem ⋮ Unequal individual genetic algorithm with intelligent diversification for the lot-scheduling problem in integrated mills using multiple-paper machines
Uses Software
Cites Work
- The use of genetic algorithms to solve the economic lot size scheduling problem
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Effect of Externalizing Setups in the Economic Lot Scheduling Problem
- Lot Sizing and Sequencing for N Products on One Facility
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Hybrid genetic algorithm for the economic lot-scheduling problem
- On the General Feasibility Test of Scheduling Lot Sizes for Several Products on One Machine
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
This page was built for publication: Hybrid genetic algorithm for group technology economic lot scheduling problem