SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM
From MaRDI portal
Publication:3442757
DOI10.1142/S0218488507004364zbMath1124.90010OpenAlexW2031835904MaRDI QIDQ3442757
Publication date: 23 May 2007
Published in: International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s0218488507004364
Deterministic scheduling theory in operations research (90B35) Fuzzy sets and logic (in connection with information, communication, or circuits theory) (94D05)
Cites Work
- A procedure for ordering fuzzy subsets of the unit interval
- Two scheduling problems with fuzzy due-dates
- Fuzzy sets as a basis for a theory of possibility
- One machine scheduling problem with fuzzy duedates
- Single machine scheduling to minimize the number of late jobs under uncertainty.
- A possibilistic approach to sequencing problems with fuzzy parameters
- On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
- Scheduling with fuzzy delays and fuzzy precedences.
- Minimizing Total Tardiness on One Machine is NP-Hard
- Fuzzy sets
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
- Unnamed Item
This page was built for publication: SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM