AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER
From MaRDI portal
Publication:3444847
DOI10.1142/S012905410700484XzbMath1117.68016OpenAlexW2063964795MaRDI QIDQ3444847
Alan J. Soper, Vitaly A. Strusevich
Publication date: 5 June 2007
Published in: International Journal of Foundations of Computer Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1142/s012905410700484x
Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Approximation algorithms (68W25)
Related Items (5)
Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ Complexity of problem \(TF2|v=1,c=2|C_{\max}\) ⋮ Preemptive scheduling on two identical parallel machines with a single transporter ⋮ Flowshop problem \(F2 \to D|v=1\), \(c\geq 1|C_{\max}\) revisited ⋮ Transporting jobs through a two‐machine open shop
Cites Work
- Two-machine shop scheduling: Compromise between flexibility and makespan value
- Optimal two- and three-stage production schedules with setup times included
- Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops
- Optimal Preemptive Scheduling of Two Unrelated Processors
- Machine scheduling with transportation considerations
This page was built for publication: AN IMPROVED APPROXIMATION ALGORITHM FOR THE TWO-MACHINE FLOW SHOP SCHEDULING PROBLEM WITH AN INTERSTAGE TRANSPORTER